Home | About us | Contact Us | Careers | Blog
Implementation Models | Case Study | White Papers
Home >> Case Studies >> High Tech Manufacturing Company Oracle OSFM Implementation
High Tech Manufacturing Company Oracle OSFM Implementation  

Rapidflow Apps helped a high technology manufacturing company build extensive integration between Oracle OSFM and the legacy MES systems providing them real-time inventory visibility across the entire Supply Chain.

Key challenges involved were:

  • Maintenance of transaction in multiple legacy application required duplication of data entry effort
  • Little or no automation between different application making system prone to human errors
  • Little visibility of WIP and inventory  position on the subcontractor sites
  • Limited capability to track Lot genealogy
  • Limited capability of doing detailed level elemental costing and operation yield based costing

Our Solution key highlights were:

  • Designed Oracle Shop Floor Management (OSFM) integration and developed inbound and outbound interfaces with the Legacy MES Systems
  • Automated the interfaces to build and synchronize the Co-products and Routings to achieved 100% Master Data accuracy
  • Real-time inventory and WIP visibility at remote internal and Subcontractor sites
  • Full lot genealogy to analyze production issues and coordinate recalls/resolutions
  • Accurate yield calculation helped cost reporting and implementing measures to improve operations output. Solution also automated product line accounting

To read more, feel free to download the case studies.

For a free demo and help with your Oracle Manufacturing and Oracle Value Chain Planning implementation, please contact us

 
Email: info@rapidflowapps.com
Phone: (866) 863 - 9310
  • 60 Days Oracle Agile Product Quality Management Implementation
  • 5 Days Oracle ASCP Performance Assessment
  • 90 Days Oracle DRP Implementation
  • 60 Days Oracle Agile PLM BI Implementation
  • 90 Days Oracle Demantra DM Implementation
  • 90 Days Oracle Demantra S&OP Implementation
  • 60 Days Oracle Production Scheduling Implementation
    More...
  • A Sporting Goods Company Oracle Agile PLM Case Study
  • COLLABORATE12: Case Study on Oracle Demantra Implementation at JR286
  • OAUG Collaborate11 Powerpoint Presentation - A Product MDM Case Study
  • A Case Study of JR286 Inc.- Senior Management Reporting in OBIEE
    More...
     
    © 2010 Rapidflow Apps. All Rights Reserved.